The model budget was calculated at the end of model integration (1000 days). The budget was integrated down to three depth levels:

The Budget in the Upper 120m (Integration 0-120m)

The Budget in the Upper 45m (Integration 0-45m)

The Budget in the Upper 10m (Integration 0-10m)